Finishing the grounds of Alcedor firm
Lack of space in grounds of the firm led us to the decision to build a new facility by the existing rearing station.
The entire construction was rather complicated by a necessity to transfer the existing ornamental pond partly located
in grounds planned for the construction site. Photographs from August 2004 to January 2005 show the course of the entire
construction from the first „dig“ into the soil, construction of tanks, assembly of foils and technology, to pictures
showing the present state.